Cart Total Items (0)

Cart

7 CM-Lean Continuing Education Hours

A Detailed Review of Production Planning & Practical Strategies for Overcoming Common Implementation Challenges

Description

The Last Planner® System is a lean production planning system designed to produce predictable workflow and continuous improvement in construction. The system has proven to help teams deliver better projects in less time at a lower cost. This workshop with show you how to improve project schedules and performance using the Last Planner System.

We will discuss why productivity in construction struggles to improve so we understand the problem that Last Planner System is designed to solve and take you through a pull planning exercise to drive home the concepts of the Last Planner® System. This course will also provide you with strategies to deal with difficult behaviours in planning meetings and show you how to create the culture necessary to support Lean and make it successful in your business and on your project site.

 This course will cover:   

  • Lean principles – flow, waste, and variation
  • Pull Planning
  • Detailed Last Planner System review
  • Common implementation challenges
  • Planning session exercise
  • Speed, quality and budget – how to get all three
  • The culture of lean and team behaviours
  • Assertively dealing with difficult personalities

Participant information for each session will be submitted to the AGC to ensure CE hours are tracked and attached to the CM-Lean holders’ account.

 

Delivery Method: Virtual Session – Zoom Meetings 

Course Fee Includes: Access to the course, course materials, and a digital certificate upon completion.  

 

This course is delivered in partnership with local and provincial construction associations across Canada. You will be participating with a group of industry peers from multiple regions.  

Sharing a single registration between two or more individuals is not permitted. Please register each person that will be in attendance.

Prerequisites

There are no prerequisites for this course. 

Who Should Attend

All members of a construction project team, including:

  • Project Coordinators
  • Project Managers
  • Site Superintendents
  • Management
  • Designers & Architects
  • Engineers & Consultants
  • Owners

Technical Requirements

  1. Computer or laptop

    • This course will involve on-screen interaction with your instructor and classmates, reading/viewing on-screen content (slides or videos), and interacting via typing with questions or responses. For this reason, cellphones may not be adequate. 

    • Windows 10 or Mac iOS. 

  1. Webcam (Mandatory)– in order to engage and collaborate, participants will be expected to have their webcams on for the duration of the class

  2. Microphone (Mandatory)

  3. Internet connection– For best results, you will want to ensure you have an internet connection with an upload/download speed of 3-5 Mbps. You can test your internet speed here. The minimum recommended speed is 1.5 Mbps, but anything below 3 Mbps may result in loss of quality or buffering. Ideally hardwired connection versus wireless for stability – connect your computer directly to your router using an ethernet cable, rather than using your home wi-fi.

  4. A quiet space with minimal distractions –The microphone will be engaged for interactive sessions. Please plan to be fully engaged in the class and clear your work schedule just as you would for the in-class program.

  5. Comfortable chair